Further, the paper discussed the necessity of using full concrete lining for the Xiaowan plunge pool and made new proposals for its bottom elevation, length and shape.
文中还讨论了小湾水垫塘采用全面混凝土衬砌的必要性,并对水垫塘底板高程、长度及体型提出了新建议。
Ultra excavation: cable trench excavation shall not exceed the bottom elevation. If ultra-dig in some places, obtain the consent of design units.
沟底超挖:开挖矿用电缆沟不得超过沟底标高,如个别地方超挖时,其处理方法应取得设计单位的同意。
In the paper, the optimum holing form and principle are put forward for the horizontal anti-seepage curtain and it is obtained that the structure with rolling bottom elevation is the optimum one.
提出了水平防渗帷幕最佳布孔连接形式和布孔原则,得出了底部高程起伏的结构形式为最佳结构形式。
应用推荐